Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Modular Frame 1x Modular Frame
Assembler
Assembler
Modular Frame (1/min)
Assembler
Assembler
Reinforced Iron Plate (3/min)
Constructor
Constructor
Iron Plate (12/min)
Smelter
Smelter
Iron Ingot (24/min)
Constructor
Constructor
Screw (72/min)
Constructor
Constructor
Iron Rod (12/min)
Smelter
Smelter
Iron Ingot (12/min)
Constructor
Constructor
Iron Rod (6/min)
Smelter
Smelter
Iron Ingot (6/min)
Smelter3x Smelter15x , 24x
Constructor4x Constructor12x , 8x
Assembler2x Assembler6x , 8x , 20x
Total: