Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Modular Frame 1x Modular Frame
Assembler
Assembler
Modular Frame (1/min)
Assembler
Assembler
Reinforced Iron Plate (3/min)
Constructor
Constructor
Iron Plate (12/min)
Smelter
Smelter
Iron Ingot (24/min)
Constructor
Constructor
Screw (72/min)
Constructor
Constructor
Iron Rod (12/min)
Smelter
Smelter
Iron Ingot (12/min)
Constructor
Constructor
Iron Rod (6/min)
Smelter
Smelter
Iron Ingot (6/min)
Oil Refinery25x Oil Refinery100x , 200x , 500x , 625x
Manufacturer5x Manufacturer25x , 25x , 125x , 25x
Smelter8x Smelter40x , 64x
Constructor2x Constructor6x , 4x
Assembler10x Assembler30x , 40x , 100x
Total: