Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Electromagnetic Control Rod 2x Electromagnetic Control Rod
Assembler
Assembler
Electromagnetic Control Rod (2/min)
Assembler
Assembler
Stator (6/min)
Constructor
Constructor
Steel Pipe (15/min)
Constructor
Constructor
Steel Pipe (3/min)
Constructor
Constructor
Wire (45/min)
Smelter
Smelter
Copper Ingot (15/min)
Constructor
Constructor
Wire (15/min)
Smelter
Smelter
Copper Ingot (5/min)
Assembler
Assembler
A.I. Limiter (4/min)
Assembler
Assembler
Circuit Board (8/min)
Constructor
Constructor
Wire (45/min)
Smelter
Smelter
Copper Ingot (15/min)
Constructor
Constructor
Wire (3/min)
Smelter
Smelter
Copper Ingot (1/min)
Oil Refinery
Oil Refinery
Plastic (22.5/min)
Oil Refinery
Oil Refinery
Plastic (1.5/min)
Constructor
Constructor
Quickwire (60/min)
Smelter
Smelter
Caterium Ingot (15/min)
Constructor
Constructor
Quickwire (12/min)
Smelter
Smelter
Caterium Ingot (3/min)
Oil Refinery2x Oil Refinery8x , 16x , 40x , 50x
Smelter6x Smelter30x , 48x
Foundry2x Foundry10x , 30x , 40x
Constructor8x Constructor24x , 16x
Assembler4x Assembler12x , 16x , 40x
Total: