Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Computer 1x Computer
Manufacturer
Manufacturer
Computer (1/min)
Assembler
Assembler
Circuit Board (5/min)
Constructor
Constructor
Wire (45/min)
Smelter
Smelter
Copper Ingot (15/min)
Miner MK2
Miner MK2
Copper Ore (28/min)
Constructor
Constructor
Wire (15/min)
Smelter
Smelter
Copper Ingot (13/min)
Miner MK2
Miner MK2
Copper Ore (28/min)
Oil Refinery
Oil Refinery
Plastic (22.5/min)
Oil Pump
Oil Pump
Crude Oil (30/min)
Oil Refinery
Oil Refinery
Plastic (7.5/min)
Oil Pump
Oil Pump
Crude Oil (10/min)
Constructor
Constructor
Cable (12/min)
Constructor
Constructor
Wire (24/min)
Smelter
Smelter
Copper Ingot (13/min)
Miner MK2
Miner MK2
Copper Ore (28/min)
Oil Refinery
Oil Refinery
Plastic (18/min)
Oil Pump
Oil Pump
Crude Oil (24/min)
Constructor
Constructor
Screw (60/min)
Constructor
Constructor
Iron Rod (10/min)
Smelter
Smelter
Iron Ingot (10/min)
Miner MK2
Miner MK2
Iron Ore (10/min)
Oil Pump1x Oil Pump5x , 10x , 30x
Oil Refinery3x Oil Refinery12x , 24x , 60x , 75x
Miner MK22x Miner MK24x , 10x , 20x , 30x
Smelter2x Smelter10x , 16x
Constructor5x Constructor15x , 10x
Assembler1x Assembler3x , 4x , 10x
Manufacturer1x Manufacturer5x , 5x , 25x , 5x
Total: