Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Compacted Coal 1x Compacted Coal
Assembler
Assembler
Compacted Coal (1/min)
Miner MK2
Miner MK2
Coal (1/min)
Miner MK2
Miner MK2
Sulfur (1/min)
Needed per minute
Sulfur1x Sulfur
Coal1x Coal
Compacted Coal1x Compacted Coal
Miner MK22x Miner MK24x , 10x , 20x , 30x
Assembler1x Assembler3x , 2x
Total: