Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Alclad Aluminum Sheet 1x Alclad Aluminum Sheet
Assembler
Assembler
Alclad Aluminum Sheet (1/min)
Foundry
Foundry
Aluminum Ingot (1/min)
Smelter
Smelter
Copper Ingot (0.66666666666667/min)
Needed per minute
Copper Ore0.66666666666667x Copper Ore
Copper Ingot0.66666666666667x Copper Ingot
Raw Quartz2x Raw Quartz
Silica3x Silica
Bauxite3.5x Bauxite
Aluminum Ingot1x Aluminum Ingot
Alclad Aluminum Sheet1x Alclad Aluminum Sheet
Smelter1x Smelter5x , 8x
Constructor1x Constructor3x , 2x
Foundry1x Foundry5x , 15x , 20x
Assembler1x Assembler3x , 4x , 10x
Total: