You need to overclock: 3 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 50%.

Fuel input
Build Cost

You need to overclock: 2 Coal-Powered Generator at 250%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 80%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 18%.

Fuel input
Supplemental Load