You need to overclock: 2 Biomass Burner at 250%, 1 Biomass Burner at 200%.

You need to underclock: 1 Biomass Burner at 33.333%.

Fuel input
Build Cost

You need to overclock: 2 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 113.333%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 84%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 18.4%.

Fuel input
Supplemental Load