You need to overclock: 2 Biomass Burner at 250%, 1 Biomass Burner at 106.667%.

Fuel input
Build Cost

You need to underclock: 1 Coal-Powered Generator at 42.667%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 72.8%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 7.28%.

Fuel input
Supplemental Load