You need to overclock: 2 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 83.333%.
-
29.6x
2.03 sPackaged Liquid Biofuel
-
49.33x
1.22 sSolid Biofuel
-
88.8x
0.68 sHog Remains
-
88.8x
0.68 sSpitter Remains
-
123.33x
0.49 sBiomass
-
222x
0.27 sFlower Petals
-
222x
0.27 sWood
-
1,110x
0.05 sMycelia
-
1,480x
0.04 sFabric
-
1,480x
0.04 sLeaves
-
135x
Iron Plate
-
135x
Iron Rod
-
225x
Wire
-
7x
Power Shard
You need to overclock: 1 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 243.333%.
-
35.24x
1.7 sCompacted Coal
-
74x
0.81 sCoal
-
123.33x
0.49 sPetroleum Coke
-
222 m³
Water
-
20x
Rotor
-
60x
Cable
-
6x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 48%.
-
4.44 m³
13.51 sIonized Fuel
-
6.17 m³
9.73 sRocket Fuel
-
11.1 m³
5.41 sTurbofuel
-
29.6 m³
2.03 sLiquid Biofuel
-
29.6 m³
2.03 sFuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 14.8%.
-
0.15x
405.41 sFicsonium Fuel Rod
-
0.03x
2,027.03 sUranium Fuel Rod
-
0.01x
4,054.05 sPlutonium Fuel Rod
-
35.52 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete