You need to overclock: 1 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 23.333%.

Fuel input
Build Cost

You need to overclock: 1 Coal-Powered Generator at 109.333%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 32.8%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 3.28%.

Fuel input
Supplemental Load