You need to overclock: 2 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 33.333%.

Fuel input
Build Cost

You need to overclock: 2 Coal Generator at 250%.

You need to underclock: 1 Coal Generator at 13.333%.

Fuel input
Supplemental Load
Build Cost

You need to overclock: 1 Fuel Generator at 250%, 1 Fuel Generator at 156.667%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 24.4%.

Fuel input
Supplemental Load