You need to overclock: 11 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 56.667%.
-
67.36x
0.89 sPackaged Liquid Biofuel
-
112.27x
0.53 sSolid Biofuel
-
202.08x
0.3 sHog Remains
-
202.08x
0.3 sSpitter Remains
-
280.67x
0.21 sBiomass
-
505.2x
0.12 sFlower Petals
-
505.2x
0.12 sWood
-
2,526x
0.02 sMycelia
-
3,368x
0.02 sFabric
-
3,368x
0.02 sLeaves
-
180x
Iron Plate
-
180x
Iron Rod
-
300x
Wire
-
33x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 122.667%.
-
80.19x
0.75 sCompacted Coal
-
168.4x
0.36 sCoal
-
280.67x
0.21 sPetroleum Coke
-
505.2 m³
Water
-
50x
Rotor
-
150x
Cable
-
13x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 36.8%.
-
10.1 m³
5.94 sIonized Fuel
-
14.03 m³
4.28 sRocket Fuel
-
25.26 m³
2.38 sTurbofuel
-
67.36 m³
0.89 sLiquid Biofuel
-
67.36 m³
0.89 sFuel
-
60x
Motor
-
120x
Copper Sheet
-
200x
Rubber
-
200x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 33.68%.
-
0.34x
178.15 sFicsonium Fuel Rod
-
0.07x
890.74 sUranium Fuel Rod
-
0.03x
1,781.47 sPlutonium Fuel Rod
-
80.83 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete