You need to overclock: 15 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 56.667%.
-
91.36x
0.66 sPackaged Liquid Biofuel
-
152.27x
0.39 sSolid Biofuel
-
274.08x
0.22 sHog Remains
-
274.08x
0.22 sSpitter Remains
-
380.67x
0.16 sBiomass
-
685.2x
0.09 sFlower Petals
-
685.2x
0.09 sWood
-
3,426x
0.02 sMycelia
-
4,568x
0.01 sFabric
-
4,568x
0.01 sLeaves
-
240x
Iron Plate
-
240x
Iron Rod
-
400x
Wire
-
45x
Power Shard
You need to overclock: 6 Coal-Powered Generator at 250%.
You need to underclock: 1 Coal-Powered Generator at 22.667%.
-
108.76x
0.55 sCompacted Coal
-
228.4x
0.26 sCoal
-
380.67x
0.16 sPetroleum Coke
-
685.2 m³
Water
-
70x
Rotor
-
210x
Cable
-
18x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%, 1 Fuel-Powered Generator at 206.8%.
-
13.7 m³
4.38 sIonized Fuel
-
19.03 m³
3.15 sRocket Fuel
-
34.26 m³
1.75 sTurbofuel
-
91.36 m³
0.66 sLiquid Biofuel
-
91.36 m³
0.66 sFuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
6x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 45.68%.
-
0.46x
131.35 sFicsonium Fuel Rod
-
0.09x
656.74 sUranium Fuel Rod
-
0.05x
1,313.49 sPlutonium Fuel Rod
-
109.63 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete