You need to overclock: 11 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 90%.
-
68.16x
0.88 sPackaged Liquid Biofuel
-
113.6x
0.53 sSolid Biofuel
-
204.48x
0.29 sHog Remains
-
204.48x
0.29 sSpitter Remains
-
284x
0.21 sBiomass
-
511.2x
0.12 sFlower Petals
-
511.2x
0.12 sWood
-
2,556x
0.02 sMycelia
-
3,408x
0.02 sFabric
-
3,408x
0.02 sLeaves
-
180x
Iron Plate
-
180x
Iron Rod
-
300x
Wire
-
33x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 136%.
-
81.14x
0.74 sCompacted Coal
-
170.4x
0.35 sCoal
-
284x
0.21 sPetroleum Coke
-
511.2 m³
Water
-
50x
Rotor
-
150x
Cable
-
13x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 40.8%.
-
10.22 m³
5.87 sIonized Fuel
-
14.2 m³
4.23 sRocket Fuel
-
25.56 m³
2.35 sTurbofuel
-
68.16 m³
0.88 sLiquid Biofuel
-
68.16 m³
0.88 sFuel
-
60x
Motor
-
120x
Copper Sheet
-
200x
Rubber
-
200x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 34.08%.
-
0.34x
176.06 sFicsonium Fuel Rod
-
0.07x
880.28 sUranium Fuel Rod
-
0.03x
1,760.56 sPlutonium Fuel Rod
-
81.79 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete