You need to overclock: 14 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 40%.
-
84.96x
0.71 sPackaged Liquid Biofuel
-
141.6x
0.42 sSolid Biofuel
-
254.88x
0.24 sHog Remains
-
254.88x
0.24 sSpitter Remains
-
354x
0.17 sBiomass
-
637.2x
0.09 sFlower Petals
-
637.2x
0.09 sWood
-
3,186x
0.02 sMycelia
-
4,248x
0.01 sFabric
-
4,248x
0.01 sLeaves
-
225x
Iron Plate
-
225x
Iron Rod
-
375x
Wire
-
42x
Power Shard
You need to overclock: 5 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 166%.
-
101.14x
0.59 sCompacted Coal
-
212.4x
0.28 sCoal
-
354x
0.17 sPetroleum Coke
-
637.2 m³
Water
-
60x
Rotor
-
180x
Cable
-
17x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 24.8%.
-
12.74 m³
4.71 sIonized Fuel
-
17.7 m³
3.39 sRocket Fuel
-
31.86 m³
1.88 sTurbofuel
-
84.96 m³
0.71 sLiquid Biofuel
-
84.96 m³
0.71 sFuel
-
75x
Motor
-
150x
Copper Sheet
-
250x
Rubber
-
250x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 42.48%.
-
0.42x
141.24 sFicsonium Fuel Rod
-
0.08x
706.21 sUranium Fuel Rod
-
0.04x
1,412.43 sPlutonium Fuel Rod
-
101.95 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete