You need to overclock: 14 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 56.667%.
-
93.76x
0.64 sPackaged Liquid Biofuel
-
156.27x
0.38 sSolid Biofuel
-
281.28x
0.21 sHog Remains
-
281.28x
0.21 sSpitter Remains
-
390.67x
0.15 sBiomass
-
703.2x
0.09 sFlower Petals
-
703.2x
0.09 sWood
-
3,516x
0.02 sMycelia
-
4,688x
0.01 sFabric
-
4,688x
0.01 sLeaves
-
270x
Iron Plate
-
270x
Iron Rod
-
450x
Wire
-
43x
Power Shard
You need to overclock: 6 Coal-Powered Generator at 250%.
You need to underclock: 1 Coal-Powered Generator at 62.667%.
-
111.62x
0.54 sCompacted Coal
-
234.4x
0.26 sCoal
-
390.67x
0.15 sPetroleum Coke
-
703.2 m³
Water
-
70x
Rotor
-
210x
Cable
-
18x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%, 1 Fuel-Powered Generator at 218.8%.
-
14.06 m³
4.27 sIonized Fuel
-
19.53 m³
3.07 sRocket Fuel
-
35.16 m³
1.71 sTurbofuel
-
93.76 m³
0.64 sLiquid Biofuel
-
93.76 m³
0.64 sFuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
6x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 46.88%.
-
0.47x
127.99 sFicsonium Fuel Rod
-
0.09x
639.93 sUranium Fuel Rod
-
0.05x
1,279.86 sPlutonium Fuel Rod
-
112.51 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete