You need to overclock: 12 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 73.333%.
-
73.76x
0.81 sPackaged Liquid Biofuel
-
122.93x
0.49 sSolid Biofuel
-
221.28x
0.27 sHog Remains
-
221.28x
0.27 sSpitter Remains
-
307.33x
0.2 sBiomass
-
553.2x
0.11 sFlower Petals
-
553.2x
0.11 sWood
-
2,766x
0.02 sMycelia
-
3,688x
0.02 sFabric
-
3,688x
0.02 sLeaves
-
195x
Iron Plate
-
195x
Iron Rod
-
325x
Wire
-
36x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 229.333%.
-
87.81x
0.68 sCompacted Coal
-
184.4x
0.33 sCoal
-
307.33x
0.2 sPetroleum Coke
-
553.2 m³
Water
-
50x
Rotor
-
150x
Cable
-
15x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 68.8%.
-
11.06 m³
5.42 sIonized Fuel
-
15.37 m³
3.9 sRocket Fuel
-
27.66 m³
2.17 sTurbofuel
-
73.76 m³
0.81 sLiquid Biofuel
-
73.76 m³
0.81 sFuel
-
60x
Motor
-
120x
Copper Sheet
-
200x
Rubber
-
200x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 36.88%.
-
0.37x
162.69 sFicsonium Fuel Rod
-
0.07x
813.45 sUranium Fuel Rod
-
0.04x
1,626.9 sPlutonium Fuel Rod
-
88.51 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete