You need to overclock: 1 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 66.667%.
-
61.6x
0.97 sPackaged Liquid Biofuel
-
102.67x
0.58 sSolid Biofuel
-
184.8x
0.32 sHog Remains
-
184.8x
0.32 sSpitter Remains
-
256.67x
0.23 sBiomass
-
462x
0.13 sFlower Petals
-
462x
0.13 sWood
-
2,310x
0.03 sMycelia
-
3,080x
0.02 sFabric
-
3,080x
0.02 sLeaves
-
360x
Iron Plate
-
360x
Iron Rod
-
600x
Wire
-
4x
Power Shard
You need to overclock: 1 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 150%.
You need to underclock: 1 Coal-Powered Generator at 26.667%.
-
73.33x
0.82 sCompacted Coal
-
154x
0.39 sCoal
-
256.67x
0.23 sPetroleum Coke
-
462 m³
Water
-
90x
Rotor
-
270x
Cable
-
4x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%.
You need to underclock: 1 Fuel-Powered Generator at 58%.
-
9.24 m³
6.49 sIonized Fuel
-
12.83 m³
4.68 sRocket Fuel
-
23.1 m³
2.6 sTurbofuel
-
61.6 m³
0.97 sLiquid Biofuel
-
61.6 m³
0.97 sFuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
3x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 30.8%.
-
0.31x
194.81 sFicsonium Fuel Rod
-
0.06x
974.03 sUranium Fuel Rod
-
0.03x
1,948.05 sPlutonium Fuel Rod
-
73.92 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete