You need to overclock: 1 Biomass Burner at 250%, 1 Biomass Burner at 150%.

You need to underclock: 1 Biomass Burner at 40%.

Fuel input
Build Cost

You need to overclock: 1 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 150%.

You need to underclock: 1 Coal-Powered Generator at 56%.

Fuel input
Supplemental Load
Build Cost

You need to overclock: 1 Fuel-Powered Generator at 196.8%.

Current result shows a 492MW power output.
Fuel input

You need to underclock: 1 Nuclear Power Plant at 19.68%.

Fuel input
Supplemental Load