You need to overclock: 1 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 46.667%.
-
27.52x
2.18 s
Packaged Liquid Biofuel
-
45.87x
1.31 s
Solid Biofuel
-
82.56x
0.73 s
Hog Remains
-
82.56x
0.73 s
Spitter Remains
-
114.67x
0.52 s
Biomass
-
206.4x
0.29 s
Flower Petals
-
206.4x
0.29 s
Wood
-
1,032x
0.06 s
Mycelia
-
1,376x
0.04 s
Fabric
-
1,376x
0.04 s
Leaves
-
150x
Iron Plate
-
150x
Iron Rod
-
250x
Wire
-
4x
Power Shard
You need to overclock: 1 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 150%.
You need to underclock: 1 Coal-Powered Generator at 58.667%.
-
32.76x
1.83 s
Compacted Coal
-
68.8x
0.87 s
Coal
-
114.67x
0.52 s
Petroleum Coke
-
206.4 m³
Water
-
30x
Rotor
-
90x
Cable
-
4x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 137.6%.
-
4.13 m³
14.53 s
Ionized Fuel
-
5.73 m³
10.47 s
Rocket Fuel
-
10.32 m³
5.81 s
Turbofuel
-
27.52 m³
2.18 s
Liquid Biofuel
-
27.52 m³
2.18 s
Fuel
-
15x
Motor
-
30x
Copper Sheet
-
50x
Rubber
-
50x
Quickwire
-
1x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 13.76%.
-
0.14x
436.05 s
Ficsonium Fuel Rod
-
0.03x
2,180.23 s
Uranium Fuel Rod
-
0.01x
4,360.47 s
Plutonium Fuel Rod
-
33.02 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete