You need to overclock: 4 Biomass Burner at 250%, 1 Biomass Burner at 113.333%.

Fuel input
Build Cost

You need to underclock: 1 Coal-Powered Generator at 45.333%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 33.6%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 13.36%.

Fuel input
Supplemental Load