You need to overclock: 13 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 90%.

Fuel input
Build Cost

You need to overclock: 5 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 126%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 12.8%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 41.28%.

Fuel input
Supplemental Load