You need to overclock: 12 Biomass Burner at 250%, 1 Biomass Burner at 200%.
You need to underclock: 1 Biomass Burner at 40%.
-
77.76x
0.77 sPackaged Liquid Biofuel
-
129.6x
0.46 sSolid Biofuel
-
233.28x
0.26 sHog Remains
-
233.28x
0.26 sSpitter Remains
-
324x
0.19 sBiomass
-
583.2x
0.1 sFlower Petals
-
583.2x
0.1 sWood
-
2,916x
0.02 sMycelia
-
3,888x
0.02 sFabric
-
3,888x
0.02 sLeaves
-
210x
Iron Plate
-
210x
Iron Rod
-
350x
Wire
-
38x
Power Shard
You need to overclock: 5 Coal-Powered Generator at 250%.
You need to underclock: 1 Coal-Powered Generator at 46%.
-
92.57x
0.65 sCompacted Coal
-
194.4x
0.31 sCoal
-
324x
0.19 sPetroleum Coke
-
583.2 m³
Water
-
60x
Rotor
-
180x
Cable
-
15x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%, 1 Fuel-Powered Generator at 138.8%.
-
11.66 m³
5.14 sIonized Fuel
-
16.2 m³
3.7 sRocket Fuel
-
29.16 m³
2.06 sTurbofuel
-
77.76 m³
0.77 sLiquid Biofuel
-
77.76 m³
0.77 sFuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
4x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 38.88%.
-
0.39x
154.32 sFicsonium Fuel Rod
-
0.08x
771.6 sUranium Fuel Rod
-
0.04x
1,543.21 sPlutonium Fuel Rod
-
93.31 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete