You need to overclock: 12 Biomass Burner at 250%, 1 Biomass Burner at 200%.
You need to underclock: 1 Biomass Burner at 73.333%.
-
83.36x
0.72 sPackaged Liquid Biofuel
-
138.93x
0.43 sSolid Biofuel
-
250.08x
0.24 sHog Remains
-
250.08x
0.24 sSpitter Remains
-
347.33x
0.17 sBiomass
-
625.2x
0.1 sFlower Petals
-
625.2x
0.1 sWood
-
3,126x
0.02 sMycelia
-
4,168x
0.01 sFabric
-
4,168x
0.01 sLeaves
-
240x
Iron Plate
-
240x
Iron Rod
-
400x
Wire
-
38x
Power Shard
You need to overclock: 5 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 139.333%.
-
99.24x
0.6 sCompacted Coal
-
208.4x
0.29 sCoal
-
347.33x
0.17 sPetroleum Coke
-
625.2 m³
Water
-
60x
Rotor
-
180x
Cable
-
16x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 16.8%.
-
12.5 m³
4.8 sIonized Fuel
-
17.37 m³
3.45 sRocket Fuel
-
31.26 m³
1.92 sTurbofuel
-
83.36 m³
0.72 sLiquid Biofuel
-
83.36 m³
0.72 sFuel
-
75x
Motor
-
150x
Copper Sheet
-
250x
Rubber
-
250x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 41.68%.
-
0.42x
143.95 sFicsonium Fuel Rod
-
0.08x
719.77 sUranium Fuel Rod
-
0.04x
1,439.54 sPlutonium Fuel Rod
-
100.03 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete