You need to overclock: 12 Biomass Burner at 250%, 1 Biomass Burner at 200%.
You need to underclock: 1 Biomass Burner at 6.667%.
-
81.76x
0.73 sPackaged Liquid Biofuel
-
136.27x
0.44 sSolid Biofuel
-
245.28x
0.24 sHog Remains
-
245.28x
0.24 sSpitter Remains
-
340.67x
0.18 sBiomass
-
613.2x
0.1 sFlower Petals
-
613.2x
0.1 sWood
-
3,066x
0.02 sMycelia
-
4,088x
0.01 sFabric
-
4,088x
0.01 sLeaves
-
240x
Iron Plate
-
240x
Iron Rod
-
400x
Wire
-
38x
Power Shard
You need to overclock: 5 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 112.667%.
-
97.33x
0.62 sCompacted Coal
-
204.4x
0.29 sCoal
-
340.67x
0.18 sPetroleum Coke
-
613.2 m³
Water
-
60x
Rotor
-
180x
Cable
-
16x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 8.8%.
-
12.26 m³
4.89 sIonized Fuel
-
17.03 m³
3.52 sRocket Fuel
-
30.66 m³
1.96 sTurbofuel
-
81.76 m³
0.73 sLiquid Biofuel
-
81.76 m³
0.73 sFuel
-
75x
Motor
-
150x
Copper Sheet
-
250x
Rubber
-
250x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 40.88%.
-
0.41x
146.77 sFicsonium Fuel Rod
-
0.08x
733.86 sUranium Fuel Rod
-
0.04x
1,467.71 sPlutonium Fuel Rod
-
98.11 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete