You need to overclock: 6 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 80%.

Fuel input
Build Cost

You need to overclock: 2 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 132%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 89.6%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 18.96%.

Fuel input
Supplemental Load