You need to overclock: 8 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 6.667%.
-
48.16x
1.25 sPackaged Liquid Biofuel
-
80.27x
0.75 sSolid Biofuel
-
144.48x
0.42 sHog Remains
-
144.48x
0.42 sSpitter Remains
-
200.67x
0.3 sBiomass
-
361.2x
0.17 sFlower Petals
-
361.2x
0.17 sWood
-
1,806x
0.03 sMycelia
-
2,408x
0.02 sFabric
-
2,408x
0.02 sLeaves
-
135x
Iron Plate
-
135x
Iron Rod
-
225x
Wire
-
24x
Power Shard
You need to overclock: 3 Coal-Powered Generator at 250%.
You need to underclock: 1 Coal-Powered Generator at 52.667%.
-
57.33x
1.05 sCompacted Coal
-
120.4x
0.5 sCoal
-
200.67x
0.3 sPetroleum Coke
-
361.2 m³
Water
-
40x
Rotor
-
120x
Cable
-
9x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 240.8%.
-
7.22 m³
8.31 sIonized Fuel
-
10.03 m³
5.98 sRocket Fuel
-
18.06 m³
3.32 sTurbofuel
-
48.16 m³
1.25 sLiquid Biofuel
-
48.16 m³
1.25 sFuel
-
15x
Motor
-
30x
Copper Sheet
-
50x
Rubber
-
50x
Quickwire
-
3x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 24.08%.
-
0.24x
249.17 sFicsonium Fuel Rod
-
0.05x
1,245.85 sUranium Fuel Rod
-
0.02x
2,491.69 sPlutonium Fuel Rod
-
57.79 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete