You need to overclock: 7 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 90%.
-
44.16x
1.36 sPackaged Liquid Biofuel
-
73.6x
0.82 sSolid Biofuel
-
132.48x
0.45 sHog Remains
-
132.48x
0.45 sSpitter Remains
-
184x
0.33 sBiomass
-
331.2x
0.18 sFlower Petals
-
331.2x
0.18 sWood
-
1,656x
0.04 sMycelia
-
2,208x
0.03 sFabric
-
2,208x
0.03 sLeaves
-
120x
Iron Plate
-
120x
Iron Rod
-
200x
Wire
-
21x
Power Shard
You need to overclock: 2 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 236%.
-
52.57x
1.14 sCompacted Coal
-
110.4x
0.54 sCoal
-
184x
0.33 sPetroleum Coke
-
331.2 m³
Water
-
30x
Rotor
-
90x
Cable
-
9x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 20.8%.
-
6.62 m³
9.06 sIonized Fuel
-
9.2 m³
6.52 sRocket Fuel
-
16.56 m³
3.62 sTurbofuel
-
44.16 m³
1.36 sLiquid Biofuel
-
44.16 m³
1.36 sFuel
-
45x
Motor
-
90x
Copper Sheet
-
150x
Rubber
-
150x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 22.08%.
-
0.22x
271.74 sFicsonium Fuel Rod
-
0.04x
1,358.7 sUranium Fuel Rod
-
0.02x
2,717.39 sPlutonium Fuel Rod
-
52.99 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete