You need to overclock: 1 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 83.333%.

Fuel input
Build Cost

You need to overclock: 1 Coal Generator at 250%.

You need to underclock: 1 Coal Generator at 63.333%.

Fuel input
Supplemental Load
Build Cost

You need to overclock: 1 Fuel Generator at 206.667%.

Current result shows a 310MW power output.
Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 12.4%.

Fuel input
Supplemental Load