You need to overclock: 6 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 50%.
-
64.8x
0.93 sPackaged Liquid Biofuel
-
108x
0.56 sSolid Biofuel
-
194.4x
0.31 sHog Remains
-
194.4x
0.31 sSpitter Remains
-
270x
0.22 sBiomass
-
486x
0.12 sFlower Petals
-
486x
0.12 sWood
-
2,430x
0.02 sMycelia
-
3,240x
0.02 sFabric
-
3,240x
0.02 sLeaves
-
270x
Iron Plate
-
270x
Iron Rod
-
450x
Wire
-
19x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%.
You need to underclock: 1 Coal-Powered Generator at 80%.
-
77.14x
0.78 sCompacted Coal
-
162x
0.37 sCoal
-
270x
0.22 sPetroleum Coke
-
486 m³
Water
-
50x
Rotor
-
150x
Cable
-
12x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%.
You need to underclock: 1 Fuel-Powered Generator at 74%.
-
9.72 m³
6.17 sIonized Fuel
-
13.5 m³
4.44 sRocket Fuel
-
24.3 m³
2.47 sTurbofuel
-
64.8 m³
0.93 sLiquid Biofuel
-
64.8 m³
0.93 sFuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
3x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 32.4%.
-
0.32x
185.19 sFicsonium Fuel Rod
-
0.06x
925.93 sUranium Fuel Rod
-
0.03x
1,851.85 sPlutonium Fuel Rod
-
77.76 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete