MW

You need to underclock: 1 Biomass Burner at 13.333%.

Fuel input
Build Cost

You need to underclock: 1 Coal Generator at 5.333%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel Generator at 2.667%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 0.16%.

Fuel input
Supplemental Load