You need to overclock: 4 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 83.333%.
-
58.4x
1.03 sPackaged Liquid Biofuel
-
97.33x
0.62 sSolid Biofuel
-
175.2x
0.34 sHog Remains
-
175.2x
0.34 sSpitter Remains
-
243.33x
0.25 sBiomass
-
438x
0.14 sFlower Petals
-
438x
0.14 sWood
-
2,190x
0.03 sMycelia
-
2,920x
0.02 sFabric
-
2,920x
0.02 sLeaves
-
270x
Iron Plate
-
270x
Iron Rod
-
450x
Wire
-
13x
Power Shard
You need to overclock: 3 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 223.333%.
-
69.52x
0.86 sCompacted Coal
-
146x
0.41 sCoal
-
243.33x
0.25 sPetroleum Coke
-
438 m³
Water
-
40x
Rotor
-
120x
Cable
-
12x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 92%.
-
8.76 m³
6.85 sIonized Fuel
-
12.17 m³
4.93 sRocket Fuel
-
21.9 m³
2.74 sTurbofuel
-
58.4 m³
1.03 sLiquid Biofuel
-
58.4 m³
1.03 sFuel
-
45x
Motor
-
90x
Copper Sheet
-
150x
Rubber
-
150x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 29.2%.
-
0.29x
205.48 sFicsonium Fuel Rod
-
0.06x
1,027.4 sUranium Fuel Rod
-
0.03x
2,054.79 sPlutonium Fuel Rod
-
70.08 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete