You need to overclock: 4 Biomass Burner at 250%, 1 Biomass Burner at 150%.

You need to underclock: 1 Biomass Burner at 96.667%.

Fuel input
Build Cost

You need to overclock: 1 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 248.667%.

Fuel input
Supplemental Load
Build Cost

You need to underclock: 1 Fuel-Powered Generator at 49.6%.

Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 14.96%.

Fuel input
Supplemental Load