You need to overclock: 4 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 56.667%.
-
100.96x
0.59 s
Packaged Liquid Biofuel
-
168.27x
0.36 s
Solid Biofuel
-
302.88x
0.2 s
Hog Remains
-
302.88x
0.2 s
Spitter Remains
-
420.67x
0.14 s
Biomass
-
757.2x
0.08 s
Flower Petals
-
757.2x
0.08 s
Wood
-
3,786x
0.02 s
Mycelia
-
5,048x
0.01 s
Fabric
-
5,048x
0.01 s
Leaves
-
540x
Iron Plate
-
540x
Iron Rod
-
900x
Wire
-
13x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 150%.
You need to underclock: 1 Coal-Powered Generator at 32.667%.
-
120.19x
0.5 s
Compacted Coal
-
252.4x
0.24 s
Coal
-
420.67x
0.14 s
Petroleum Coke
-
757.2 m³
Water
-
110x
Rotor
-
330x
Cable
-
13x
Power Shard
You need to overclock: 2 Fuel-Powered Generator at 250%.
You need to underclock: 1 Fuel-Powered Generator at 4.8%.
-
15.14 m³
3.96 s
Ionized Fuel
-
21.03 m³
2.85 s
Rocket Fuel
-
37.86 m³
1.58 s
Turbofuel
-
100.96 m³
0.59 s
Liquid Biofuel
-
100.96 m³
0.59 s
Fuel
-
45x
Motor
-
90x
Copper Sheet
-
150x
Rubber
-
150x
Quickwire
-
6x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 50.48%.
-
0.5x
118.86 s
Ficsonium Fuel Rod
-
0.1x
594.29 s
Uranium Fuel Rod
-
0.05x
1,188.59 s
Plutonium Fuel Rod
-
121.15 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete