You need to overclock: 9 Biomass Burner at 250%, 1 Biomass Burner at 200%.
You need to underclock: 1 Biomass Burner at 16.667%.
- 0.79 s
-
126.67x
0.47 sSolid Biofuel
- 0.26 s
-
228x
0.26 sHog Remains
-
316.67x
0.19 sBiomass
-
570x
0.11 sFlower Petals
-
570x
0.11 sWood
-
2,850x
0.02 sMycelia
-
3,800x
0.02 sFabric
-
3,800x
0.02 sLeaves
-
270x
Iron Plate
-
270x
Iron Rod
-
450x
Wire
-
29x
Power Shard
You need to overclock: 5 Coal Generator at 250%.
You need to underclock: 1 Coal Generator at 16.667%.
-
90.48x
0.66 sCompacted Coal
-
190x
0.32 sCoal
-
316.67x
0.19 sPetroleum Coke
-
570 m³
Water
-
60x
Rotor
-
180x
Cable
-
15x
Power Shard
You need to overclock: 2 Fuel Generator at 250%, 1 Fuel Generator at 133.333%.
-
28.5 m³
2.11 sTurbofuel
-
76 m³
0.79 sLiquid Biofuel
-
76 m³
0.79 sFuel
-
15x
Computer
-
45x
Motor
-
150x
Rubber
-
150x
Quickwire
-
7x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 38%.
-
0.08x
789.47 sUranium Fuel Rod
-
0.04x
1,578.95 sPlutonium Fuel Rod
-
91.2 m³
Water