You need to overclock: 7 Biomass Burner at 250%.
You need to underclock: 1 Biomass Burner at 83.333%.
-
72.8x
0.82 sPackaged Liquid Biofuel
-
121.33x
0.49 sSolid Biofuel
-
218.4x
0.27 sHog Remains
-
218.4x
0.27 sSpitter Remains
-
303.33x
0.2 sBiomass
-
546x
0.11 sFlower Petals
-
546x
0.11 sWood
-
2,730x
0.02 sMycelia
-
3,640x
0.02 sFabric
-
3,640x
0.02 sLeaves
-
300x
Iron Plate
-
300x
Iron Rod
-
500x
Wire
-
21x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 213.333%.
-
86.67x
0.69 sCompacted Coal
-
182x
0.33 sCoal
-
303.33x
0.2 sPetroleum Coke
-
546 m³
Water
-
50x
Rotor
-
150x
Cable
-
15x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 64%.
-
10.92 m³
5.49 sIonized Fuel
-
15.17 m³
3.96 sRocket Fuel
-
27.3 m³
2.2 sTurbofuel
-
72.8 m³
0.82 sLiquid Biofuel
-
72.8 m³
0.82 sFuel
-
60x
Motor
-
120x
Copper Sheet
-
200x
Rubber
-
200x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 36.4%.
-
0.36x
164.84 sFicsonium Fuel Rod
-
0.07x
824.18 sUranium Fuel Rod
-
0.04x
1,648.35 sPlutonium Fuel Rod
-
87.36 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete