You need to overclock: 4 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 50%.
-
67.2x
0.89 sPackaged Liquid Biofuel
-
112x
0.54 sSolid Biofuel
-
201.6x
0.3 sHog Remains
-
201.6x
0.3 sSpitter Remains
-
280x
0.21 sBiomass
-
504x
0.12 sFlower Petals
-
504x
0.12 sWood
-
2,520x
0.02 sMycelia
-
3,360x
0.02 sFabric
-
3,360x
0.02 sLeaves
-
330x
Iron Plate
-
330x
Iron Rod
-
550x
Wire
-
13x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 120%.
-
80x
0.75 sCompacted Coal
-
168x
0.36 sCoal
-
280x
0.21 sPetroleum Coke
-
504 m³
Water
-
50x
Rotor
-
150x
Cable
-
13x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 36%.
-
10.08 m³
5.95 sIonized Fuel
-
14 m³
4.29 sRocket Fuel
-
25.2 m³
2.38 sTurbofuel
-
67.2 m³
0.89 sLiquid Biofuel
-
67.2 m³
0.89 sFuel
-
60x
Motor
-
120x
Copper Sheet
-
200x
Rubber
-
200x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 33.6%.
-
0.34x
178.57 sFicsonium Fuel Rod
-
0.07x
892.86 sUranium Fuel Rod
-
0.03x
1,785.71 sPlutonium Fuel Rod
-
80.64 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete