You need to overclock: 8 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 83.333%.
-
65.6x
0.91 s
Packaged Liquid Biofuel
-
109.33x
0.55 s
Solid Biofuel
-
196.8x
0.3 s
Hog Remains
-
196.8x
0.3 s
Spitter Remains
-
273.33x
0.22 s
Biomass
-
492x
0.12 s
Flower Petals
-
492x
0.12 s
Wood
-
2,460x
0.02 s
Mycelia
-
3,280x
0.02 s
Fabric
-
3,280x
0.02 s
Leaves
-
225x
Iron Plate
-
225x
Iron Rod
-
375x
Wire
-
25x
Power Shard
You need to overclock: 4 Coal-Powered Generator at 250%.
You need to underclock: 1 Coal-Powered Generator at 93.333%.
-
78.1x
0.77 s
Compacted Coal
-
164x
0.37 s
Coal
-
273.33x
0.22 s
Petroleum Coke
-
492 m³
Water
-
50x
Rotor
-
150x
Cable
-
12x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%.
You need to underclock: 1 Fuel-Powered Generator at 78%.
-
9.84 m³
6.1 s
Ionized Fuel
-
13.67 m³
4.39 s
Rocket Fuel
-
24.6 m³
2.44 s
Turbofuel
-
65.6 m³
0.91 s
Liquid Biofuel
-
65.6 m³
0.91 s
Fuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
3x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 32.8%.
-
0.33x
182.93 s
Ficsonium Fuel Rod
-
0.07x
914.63 s
Uranium Fuel Rod
-
0.03x
1,829.27 s
Plutonium Fuel Rod
-
78.72 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete