You need to overclock: 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 16.667%.
- 9.37 s
-
10.67x
5.62 sSolid Biofuel
-
19.2x
3.13 sHog Remains
-
19.2x
3.13 sSpitter Remains
-
26.67x
2.25 sBiomass
-
48x
1.25 sFlower Petals
-
48x
1.25 sWood
-
240x
0.25 sMycelia
-
320x
0.19 sFabric
-
320x
0.19 sLeaves
-
45x
Iron Plate
-
45x
Iron Rod
-
75x
Wire
-
1x
Power Shard
You need to overclock: 1 Coal-Powered Generator at 106.667%.
-
7.62x
7.87 sCompacted Coal
-
16x
3.75 sCoal
-
26.67x
2.25 sPetroleum Coke
-
48 m³
Water
-
10x
Rotor
-
30x
Cable
-
1x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 32%.
-
0.96 m³
62.5 sIonized Fuel
-
1.33 m³
45 sRocket Fuel
-
2.4 m³
25 sTurbofuel
-
6.4 m³
9.38 sLiquid Biofuel
-
6.4 m³
9.38 sFuel
-
15x
Motor
-
30x
Copper Sheet
-
50x
Rubber
-
50x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 3.2%.
-
0.03x
1,875 sFicsonium Fuel Rod
-
0.01x
9,375 sUranium Fuel Rod
- 18,750 s
-
7.68 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete