You need to overclock: 3 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 33.333%.
-
41.6x
1.44 sPackaged Liquid Biofuel
-
69.33x
0.87 sSolid Biofuel
-
124.8x
0.48 sHog Remains
-
124.8x
0.48 sSpitter Remains
-
173.33x
0.35 sBiomass
-
312x
0.19 sFlower Petals
-
312x
0.19 sWood
-
1,560x
0.04 sMycelia
-
2,080x
0.03 sFabric
-
2,080x
0.03 sLeaves
-
195x
Iron Plate
-
195x
Iron Rod
-
325x
Wire
-
10x
Power Shard
You need to overclock: 2 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 193.333%.
-
49.52x
1.21 sCompacted Coal
-
104x
0.58 sCoal
-
173.33x
0.35 sPetroleum Coke
-
312 m³
Water
-
30x
Rotor
-
90x
Cable
-
8x
Power Shard
You need to underclock: 1 Fuel-Powered Generator at 8%.
-
6.24 m³
9.62 sIonized Fuel
-
8.67 m³
6.92 sRocket Fuel
-
15.6 m³
3.85 sTurbofuel
-
41.6 m³
1.44 sLiquid Biofuel
-
41.6 m³
1.44 sFuel
-
45x
Motor
-
90x
Copper Sheet
-
150x
Rubber
-
150x
Quickwire
You need to underclock: 1 Nuclear Power Plant at 20.8%.
-
0.21x
288.46 sFicsonium Fuel Rod
-
0.04x
1,442.31 sUranium Fuel Rod
-
0.02x
2,884.62 sPlutonium Fuel Rod
-
49.92 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete