You need to overclock: 2 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 50%.
-
40.8x
1.47 sPackaged Liquid Biofuel
-
68x
0.88 sSolid Biofuel
-
122.4x
0.49 sHog Remains
-
122.4x
0.49 sSpitter Remains
-
170x
0.35 sBiomass
-
306x
0.2 sFlower Petals
-
306x
0.2 sWood
-
1,530x
0.04 sMycelia
-
2,040x
0.03 sFabric
-
2,040x
0.03 sLeaves
-
210x
Iron Plate
-
210x
Iron Rod
-
350x
Wire
-
7x
Power Shard
You need to overclock: 2 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 150%.
You need to underclock: 1 Coal-Powered Generator at 30%.
-
48.57x
1.24 sCompacted Coal
-
102x
0.59 sCoal
-
170x
0.35 sPetroleum Coke
-
306 m³
Water
-
40x
Rotor
-
120x
Cable
-
7x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 204%.
-
6.12 m³
9.8 sIonized Fuel
-
8.5 m³
7.06 sRocket Fuel
-
15.3 m³
3.92 sTurbofuel
-
40.8 m³
1.47 sLiquid Biofuel
-
40.8 m³
1.47 sFuel
-
15x
Motor
-
30x
Copper Sheet
-
50x
Rubber
-
50x
Quickwire
-
3x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 20.4%.
-
0.2x
294.12 sFicsonium Fuel Rod
-
0.04x
1,470.59 sUranium Fuel Rod
-
0.02x
2,941.18 sPlutonium Fuel Rod
-
48.96 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete