You need to overclock: 2 Biomass Burner at 250%.

You need to underclock: 1 Biomass Burner at 66.667%.

Fuel input
Build Cost

You need to overclock: 1 Coal Generator at 250%.

You need to underclock: 1 Coal Generator at 56.667%.

Fuel input
Supplemental Load
Build Cost

You need to overclock: 1 Fuel Generator at 153.333%.

Current result shows a 230MW power output.
Fuel input
Build Cost

You need to underclock: 1 Nuclear Power Plant at 9.2%.

Fuel input
Supplemental Load