You need to overclock: 2 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 16.667%.
-
97.6x
0.61 s
Packaged Liquid Biofuel
-
162.67x
0.37 s
Solid Biofuel
-
292.8x
0.2 s
Hog Remains
-
292.8x
0.2 s
Spitter Remains
-
406.67x
0.15 s
Biomass
-
732x
0.08 s
Flower Petals
-
732x
0.08 s
Wood
-
3,660x
0.02 s
Mycelia
-
4,880x
0.01 s
Fabric
-
4,880x
0.01 s
Leaves
-
570x
Iron Plate
-
570x
Iron Rod
-
950x
Wire
-
7x
Power Shard
You need to overclock: 2 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 150%.
You need to underclock: 1 Coal-Powered Generator at 76.667%.
-
116.19x
0.52 s
Compacted Coal
-
244x
0.25 s
Coal
-
406.67x
0.15 s
Petroleum Coke
-
732 m³
Water
-
130x
Rotor
-
390x
Cable
-
7x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%, 1 Fuel-Powered Generator at 238%.
-
14.64 m³
4.1 s
Ionized Fuel
-
20.33 m³
2.95 s
Rocket Fuel
-
36.6 m³
1.64 s
Turbofuel
-
97.6 m³
0.61 s
Liquid Biofuel
-
97.6 m³
0.61 s
Fuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
6x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 48.8%.
-
0.49x
122.95 s
Ficsonium Fuel Rod
-
0.1x
614.75 s
Uranium Fuel Rod
-
0.05x
1,229.51 s
Plutonium Fuel Rod
-
117.12 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete