You need to overclock: 1 Biomass Burner at 250%, 1 Biomass Burner at 200%.
You need to underclock: 1 Biomass Burner at 83.333%.
-
82.4x
0.73 sPackaged Liquid Biofuel
-
137.33x
0.44 sSolid Biofuel
-
247.2x
0.24 sHog Remains
-
247.2x
0.24 sSpitter Remains
-
343.33x
0.17 sBiomass
-
618x
0.1 sFlower Petals
-
618x
0.1 sWood
-
3,090x
0.02 sMycelia
-
4,120x
0.01 sFabric
-
4,120x
0.01 sLeaves
-
480x
Iron Plate
-
480x
Iron Rod
-
800x
Wire
-
5x
Power Shard
You need to overclock: 1 Coal-Powered Generator at 250%, 1 Coal-Powered Generator at 200%.
You need to underclock: 1 Coal-Powered Generator at 23.333%.
-
98.1x
0.61 sCompacted Coal
-
206x
0.29 sCoal
-
343.33x
0.17 sPetroleum Coke
-
618 m³
Water
-
120x
Rotor
-
360x
Cable
-
5x
Power Shard
You need to overclock: 1 Fuel-Powered Generator at 250%, 1 Fuel-Powered Generator at 162%.
-
12.36 m³
4.85 sIonized Fuel
-
17.17 m³
3.5 sRocket Fuel
-
30.9 m³
1.94 sTurbofuel
-
82.4 m³
0.73 sLiquid Biofuel
-
82.4 m³
0.73 sFuel
-
30x
Motor
-
60x
Copper Sheet
-
100x
Rubber
-
100x
Quickwire
-
5x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 41.2%.
-
0.41x
145.63 sFicsonium Fuel Rod
-
0.08x
728.16 sUranium Fuel Rod
-
0.04x
1,456.31 sPlutonium Fuel Rod
-
98.88 m³
Water
-
10x
Supercomputer
-
200x
Cable
-
250x
Concrete