You need to overclock: 7 Biomass Burner at 250%, 1 Biomass Burner at 150%.
You need to underclock: 1 Biomass Burner at 33.333%.
- 0.75 s
-
133.33x
0.45 s
Solid Biofuel
- 0.25 s
-
240x
0.25 s
Hog Remains
-
333.33x
0.18 s
Biomass
-
600x
0.1 s
Flower Petals
-
600x
0.1 s
Wood
-
3,000x
0.02 s
Mycelia
-
4,000x
0.02 s
Fabric
-
4,000x
0.02 s
Leaves
-
345x
Iron Plate
-
345x
Iron Rod
-
575x
Wire
-
22x
Power Shard
You need to overclock: 5 Coal Generator at 250%.
You need to underclock: 1 Coal Generator at 83.333%.
-
95.24x
0.63 s
Compacted Coal
-
200x
0.3 s
Coal
-
333.33x
0.18 s
Petroleum Coke
-
600 m³
Water
-
60x
Rotor
-
180x
Cable
-
15x
Power Shard
You need to overclock: 2 Fuel Generator at 250%, 1 Fuel Generator at 166.667%.
-
30 m³
2 s
Turbofuel
-
80 m³
0.75 s
Liquid Biofuel
-
80 m³
0.75 s
Fuel
-
15x
Computer
-
45x
Motor
-
150x
Rubber
-
150x
Quickwire
-
8x
Power Shard
You need to underclock: 1 Nuclear Power Plant at 40%.
-
0.08x
750 s
Uranium Fuel Rod
-
0.04x
1,500 s
Plutonium Fuel Rod
-
96 m³
Water