Hypertube Canon Station Right

Hypertube Canon Station Right side, using a 4 M fundation it's easier for snaping the blueprint. To connect the electricity, it's below the building.

  • Skabt den 18/10/2024 17.27.32
  • Sidst opdateret den 18/10/2024 17.40.10