Hypertube Canon Station Right

Hypertube Canon Station Right side, using a 4 M fundation it's easier for snaping the blueprint. To connect the electricity, it's below the building.

  • Created on 18‏/10‏/2024 5:27:32 م
  • Last updated on 18‏/10‏/2024 5:40:10 م