[Up5] Steal pipe/beam with electrical choice (780+2100 or 1560 or 4200)
[Updated for update5] with 2 wings (empty)
Not the best recipe (i think its with compacted coal), but less machines, so, best fps :) Its a part two of my factory "steel ingot production (6300/min)" included
This factory is designed to give you a choice. It consumes the 6,300 steel ingots produced from stage 1. Each line (beam and pipes) receives half of the 6300 ingots.
With the circuit breakers you can choose the state of the plant:
By default, state 1, the factory offers: 780 steel beams and 2100 pipes.
In state 2 (cut the pipes 1, start beam 1 & 2): 1560 steel beams
In state 3 (cut the beams 1, start pipes 1 & 2): 4200 pipes.
The conveyor system allows you to provide the necessary steel ingot to each state, as long as you respect the 3 states offered.
The output conveyor system allows stations and helipads to be supplied, regardless of the state, everything is designed to be as high as possible. However, depending on the state, be careful:
State 1 will only correctly fill 3 heliports with pipes (out of 6) or 3 freights pipes in the event of repeated puncture. And 1 beam helipad or 1 beam station.
State 2 will only fill the 2 beam helipads or the 2 beam stations.
State 3 will only fill the 6 pipe helipads or the 6 pipe stations.
Basically, all stations and all helipads will be full. These details only concern the consumption of beams / pipes. In other words, you can use both systems (trains and helipads) but on the condition that you only take half of the resources of each. I do not know if it is very clear? :) Just understand that the conveyor system can smoothly fill any vehicle, BUT each cargo / heliport is a 780 units / minute line. If you are in state 1, you will have 780 beams which will be distributed in 1 freight beam and 1 heliport beam (390 each, except if full, and the vacuum will benefit from the 780).
You can also cut the helipads, electrically, to use only the stations (to be connected to your rail system) at 100%.
Etage 1
Needed : 4200 coal (1260 import needed) + 2275 iron + 1300 water.
26 refineries (4225 iron ingot) 42 alt solid steel ingot (6300 steel ingot) Power needed : ~8000
Electrical circuits system for : Light, Steel production, Iron production + heliports + steal beam and steal pipe production (780/+2100 beam+pipes or 1560 beam or 4200 pipes)
Etage 2 :
Consumption : 6300 steal ingots
State 1, the factory offers: 780 steel beams and 2100 pipes.
In state 2 (cut the pipes, start beam 2): 1560 steel beams
In state 3 (cut the beams, start pipes 2): 4200 pipes.
Tour in french : https://youtu.be/3LVt1FaCgxo (old skin)
If you don't need as many resources, just switch all the machines to non-overclock (100%) (everything is divided by 2.5)
Results :
312 beams (or 624) 840 pipes (or 1680)
The needs become:
1680 coal (no need importation)
Iron ore: 910
Water: 520
- 项目计数 14,939
- 坐标 131,520 / -20,560
- 仅粘贴在原始位置 Yes
- 类别 Architecture Complete factory UPDATE 4
- 创建于 2021年5月6日 下午4:56:04
- 最后更新于 2021年11月18日 下午1:20:59
- 地基 1m 1,940
- 基础墙壁 4m 1,869
- 5级传送带 1,566
- 地基 1m 1,252
- 基础墙壁 4m 703
- 电源线 694
- 大型混凝土支柱 525
- 基础墙壁 4m 510
- 传送带立架 452
- 小型混凝土支柱 406
- 1级墙插 360
- 丁字步行道 306
- 传送分离器 253
- 双面坡道 8m 234
- 传送合并器 217
- 幕墙框架窗户 190
- 平房顶 188
- 5级垂直传送带 182
- 地基 4m 166
- 漆刷梁 158
- 房顶 4m 152
- 平房顶 142
- 坡道 1m 138
- 构造器 126
- 丁字天桥 115
- 2级管道 106
- 直步行道 102
- 基础墙壁 1m 101
- 玻璃框架地基 95
- 梁连接器 83
- 六边框架窗户 64
- 地基 1m 57
- 房顶 2m 57
- 房顶 2m 56
- 房顶 1m 56
- 传送带叠架 43
- 铸造器 42
- 十字步行道 40
- 工业存储器 38
- 房顶 1m 37
- 房顶 2m 37
- 房顶 4m 37
- 双面坡道 8m 34
- 吸顶灯 33
- 1级双面墙插 33
- 现代栏杆 31
- 管道交叉接头 29
- 地基 4m 28
- 铁轨 28
- 精炼厂 26
- 三传送口墙壁 25
- 标签牌 2m 25
- 双面坡道 4m 24
- 框架窗户 23
- 倒坡道 4m 22
- 单格窗户 21
- 管道支架 21
- 倒凸角坡道 4m 19
- 坡形墙壁 4m 19
- 工业栏杆 19
- 天桥楼梯 19
- 步行道斜坡 18
- 竖向牌 17
- 坡道 1m 15
- 斜面墙壁 8m 15
- 坡形墙壁 4m 15
- 单传送口墙壁 15
- 拐角天桥 14
- 泛光壁灯 13
- 单格窗户 13
- 中间开门墙壁 13
- 框架地基 12
- 基础墙壁 1m 12
- 电源开关 12
- 地基 4m 11
- 倒坡道 1m 11
- 双面坡道 2m 11
- 管道叠架 11
- 1级电线杆 11
- 坡道 4m 10
- 传送带壁架 10
- 货运站台 10
- 基础墙壁 1m 9
- 超级管道 9
- 地基 2m 8
- 直行天桥 8
- 无人机港 8
- 十字天桥 7
- 方形牌 1m 7
- 标签牌 3m 7
- 3级采矿机 7
- 倒四分一管道墙 6
- 单传送口墙壁 6
- 框架窗户 6
- 侧开门墙壁 6
- 拐角步行道 6
- 天桥斜坡 6
- 抽水站 6
- 管道穿墙孔 6
- 2级管道泵 6
- 铁轨道岔控制杆 6
- 倒坡形墙壁 4m 5
- 直梯 5
- 超级管道穿墙孔 5
- 凸角坡道 4m 4
- 坡道 2m 4
- 双传送口墙壁 4
- 方形牌 0.5m 4
- 超级管道入口 4
- 门框墙壁 3
- 倒坡形墙壁 4m 3
- 侧开门墙壁 3
- 管道壁架 3
- 区间信号灯 3
- 火车站 3
- 倒凹角坡道 4m 2
- 灯光控制面板 2
- 大型金属支柱 2
- 坡形墙壁 4m 2
- 门框墙壁 2
- 双传送口墙壁 2
- 自动大门 2
- 超级管道壁架 2
- 超级管道地板孔 2
- 超级管道支架 2
- 凹角坡道 4m 1
- 平房顶 1
- 金属梁 1
- 斜面墙壁 4m 1
- 坡形墙壁 1m 1
- 倒坡形墙壁 1m 1
- 坡形墙壁 1m 1
- 门框墙壁 1
- 标签牌 4m 1
- 3级电线杆 1