Phase 3 EncasedBeam 18.936 mk4 4x3

Output: Encased Industrial Beam 18.936/min

Input: Iron Ore 240/min, Limestone 240/min, 418.8 MW

Footprint: 4x2.5 foundations

A stacked Encased Industrial Beam plant for phase 3 using only iron ore and limestone. Modifying any of the machines or logistics will likely result in a non-functioning plant. Aesthetics can be modified in the Mk3 Blueprint Designer.

  • Створено 24 черв. 2025 22:29:09
  • Останнє оновлення 24 черв. 2025 22:29:49
  • Попередній перегляд (Alpha Test) See blueprint